Andersen Air Force Base Fuel Storage Tank Rehabiliation

Andersen Air Force Base Fuel Storage Tank Rehabiliation

 April 29, 2022

IIC Inspector on Guam was present for lead abatement on Tanks located on AAFB. During the lead abatement process, IIC witnessed CSN testing and helped with the brainstorming of the elimination of the soluble salts on the surface. IIC also witnessed the testing of the abrasive via Test A for soluble salts, blotter testing, and […]

A13 & A15 CSN Testing

A13 & A15 CSN Testing

 April 29, 2022

IIC Inspectors performed Chlorides, Nitrates & Sulfides (CSN) testing on 02 fuel storage tanks at Andersen Air Force Base due to the Dept. Defense’s specifications, an AMPP (SSPC) QP5 inspection company was required to perform CSN throughout the surface preparation process for rehabilitating 02 critical fuel storage tanks. IIC performed extensive testing holding the contractors […]

POL Hardening P-652

POL Hardening P-652

 April 29, 2022

IIC Inspectors in Guam performed AMPP(SSPC) QP5 inspections on the installation of new fuel lines, valve pits, and pump houses complete with pumps and motors. IIC ensured the coatings project met the Dept. of Defense’s strict quality assurance and reporting standards through all stages of the coatings project.

NFS Carlsbad Caverns Elevator Shaft Rehab

NFS Carlsbad Caverns Elevator Shaft Rehab

 April 27, 2022

The project consisted of surface preparation of the existing galvanized steel of the cavern elevator’s shaft. Prior to the arrival of IIC inspectors, de-leading of the structure was performed. Multiple surface preparation methods were then employed to achieve an SSPC SP11 prior to coating application. inspections were accessed by spider baskets from ground level down […]