The IIG Inspector on Guam was present for lead abatement on Tanks located on AAFB. During the lead abatement process, IIG witnessed CSN testing and helped brainstorm of the elimination of the soluble salts on the surface. IIG also seen the abrasive testing via Test A for soluble salts, blotter testing, and profile inspection to ensure the quality of the results was within the UFGS specifications 09 97 13.17.
Andersen Air Force Base Fuel Storage Tank Rehabiliation
Government & Military