Andersen Air Force Base Fuel Storage Tank Rehabiliation
April 29, 2022The IIG Inspector on Guam was present for lead abatement on Tanks located on AAFB. During the lead abatement process, IIG witnessed CSN testing and helped brainstorm of the elimination of the soluble salts on the surface. IIG also seen the abrasive testing via Test A for soluble salts, blotter testing, and profile inspection to […]
A13 & A15 CSN Testing
April 29, 2022IIG Inspectors performed Chlorides, Nitrates & Sulfides (CSN) testing on 02 fuel storage tanks at Andersen Air Force Base due to the Dept. Defense’s specifications, an AMPP (SSPC) QP5 inspection company was required to perform CSN throughout the surface preparation process for rehabilitating 02 critical fuel storage tanks. IIG performed extensive testing holding the contractors […]
POL Hardening P-652
April 29, 2022IIG Inspectors in Guam performed AMPP(SSPC) QP5 inspections on the installation of new fuel lines, valve pits, and pump houses complete with pumps and motors. IIG ensured the coatings project met the Dept. of Defense’s strict quality assurance and reporting standards through all stages of the coatings project.
NFS Carlsbad Caverns Elevator Shaft Rehab
April 27, 2022The project consisted of surface preparation of the existing galvanized steel of the cavern elevator’s shaft. Prior to the arrival of IIG inspectors, de-leading of the structure was performed. Multiple surface preparation methods were then employed to achieve an SSPC SP11 prior to coating application. inspections were accessed by spider baskets from ground level down […]