IIG Inspectors assisted in analyzing a coating system failure in a thickener on APS’s Four Corners Power Plant. IIG worked with the infrastructure owner, painting contractor, and paint manufacturer to develop a coating system that would withstand the extreme environment. IIG then performed inspections to ensure the coatings system was being installed in accordance with the manufacturer’s recommendations.

APS’s Four Corners Power Plant
structured steels covered with plastic
blue piece of tape sticking out on the concrete rock
a large plastic sheet on the side of power plant
coatings on the concrete rock

  • Client Name: MMI
  • Project Location: Farmington, NM
  • Project Cost: N/A
  • Completion Date: March 2022