IIG Inspector was asked to perform adhesion testing of a floor coating system that had been applied 10 + years ago. Inspectors applied 36 dollies in 12 preselected locations on the top floor of the parking garage. Then conducted the pulls 24 hours later to determine if the coating system had still adhered to the substrate.

Tape test on floor coating
Pull-off adhesion testing on floor coating
Parking garage adhesion testing on floor coating
Results of adhesion testing on floor coating

  • Client Name: McCarthy Builders
  • Project Location: Flagstaff, AZ
  • Project Cost: N/A
  • Completion Date: June 2022